0402 327 846 info@mctelectricians.com.au 24/7 emergency electrical service available
Contact
Structured cabling, points and racks

Data & Communications in Lilydale

Data cabling, network points and comms racks for your premises. Contact us for a free quote.

Google

Rated 5.0 from 100+ Google reviews

Ceiling-mounted wireless access point installed
Wireless is not a cabling plan

Everything Depends on the Network Now

POS, bookings, cameras, phones, music and payments all run over the network. When it drops, trading stops.

Plenty of premises try to do all of that over wireless from a single modem in a back office. It works until the room fills up, and then it does not.

Retrofitting cabling afterwards is the expensive version. Once the linings and ceilings are finished, every cable run becomes a negotiation.

Commercial space with cabling and equipment installed
Run while the walls are open

Cabling Done at the Right Time

We run structured data cabling, install data points where the equipment actually lives, and set up comms racks and patching so the whole thing is manageable rather than a bundle behind a cupboard.

Access points get cabled rather than relying on repeaters, which is the difference between coverage that works during service and coverage that works when the room is empty.

The best time for all of this is during a fit-out or refurbishment, while the walls and ceilings are open and the cable route costs almost nothing.

We do the same work in homes, where data points to a study, media area or wireless access point are increasingly part of a renovation.

  • Over 15 years of electrical experience
  • 100+ five-star Google reviews
  • Licensed and insured
Get A Free Quote
Reviews

Rated 5.0 from 100+ Google Reviews

  • Maria Patsavouras Google Review

    Sam from Millerco Technologies did some electrical work for us during our renovation through our builder. Since then, he’s installed our security CCTV cameras and Intercom, and will be coming back to install our Heatstrips, Fan and TV. He’s lovely to deal with, responds quickly to messages, and is always punctual. Highly recommend!

    Google
  • Kyle Williamson Google Review

    I have approached sam and his crew to assist me in multiple projects over the years and i would highly recommend his services to anyone who is looking to attain a complete finished electrical service with a can do attitude.

    Google
  • Geq Logic Google Review

    Great service, easy to deal with, communication second to none and top quality workmanship

    Google
Contact Us

Get A Free Data Cabling Quote

Tell us about the premises and how many points you need, and we will come back with a free quote.

Get A Free Quote

MillerCo Technologies work van at a job siteSam Miller, licensed electrician and owner of MillerCo TechnologiesElectrician from the MillerCo Technologies team
The team behind the work

Power, Lighting and Data From One Team

Having the same team run the power, the lighting and the data means it gets planned together and finished together. Over 15 years of commercial work across Melbourne's east, and it is cheaper as one scope than as three separate visits.

You get a fixed price before we start, the same team from the quote through to the finish, and your place left tidy. Get in touch today for a free quote.

  • Over 15 years of experience in the electrical trade
  • 5.0 rating from 100+ Google reviews
  • Family-run, licensed and insured
Asked Questions

Data & Communications Questions

  • During a fit-out or renovation, while the walls and ceilings are open. Retrofitting into a finished space is possible but considerably more expensive and disruptive.

  • Yes, and it is worth doing properly. Cabled access points give consistent coverage, where repeaters and mesh extenders tend to struggle once a space is busy.

  • Yes, along with patching so the installation stays manageable rather than becoming a bundle of unlabelled cable in a cupboard.

  • Yes. Data points to a study, media area or access point are common in renovations. See renovations and extensions.

  • Yes, and it should be one coordinated scope. See commercial fit-outs.